作 者:何明 李云飞 张月 He Ming;Li Yunfei;Zhang Yue(Pingmei Shenma Construction Engineering Group Co.,Ltd.,Henan Pingdingshan 046700;Shanxi Liulin Xingwu Coal Mine Co.,Ltd.,Shanxi Lvliang 033300)
机构地区:[1]平煤神马建工集团有限公司,河南平顶山046700 [2]山西柳林兴无煤矿有限责任公司,山西吕梁033300
出 处:《山东煤炭科技》2021年第3期47-48,51,共3页Shandong Coal Science and Technology
摘 要:针对兴无煤矿下组煤井底煤仓施工断面大、施工周期长、支护难度大等技术难题,通过采用正掘下行光面爆破施工工艺、“锚网+双层钢筋网混凝土浇筑”支护,提高了煤仓施工效率,降低了煤仓施工煤矸运输难度,保证了大断面煤仓围岩稳定,取得了显著应用成效。Aiming at the technical problems of large section,long construction period and difficult support of the bottom coal bunker in Xingwu Coal Mine.By adopting the construction technology of smooth blasting under the heading and the support of"anchor net+double-layer reinforced concrete pouring",the construction efficiency of coal bunker is improved,the difficulty of coal gangue transportation in coal bunker construction is reduced,the stability of surrounding rock of large section coal bunker is ensured,and remarkable application effect is achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.221.165