检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王向明 WANG Xiang-ming(Xiaohe River Basin Bureau of Jimzhong City,Shanxi Province,Jinzhong 030600,China)
出 处:《南水北调与水利科技》2015年第S01期61-62,共2页South-to-North Water Transfers and Water Science & Technology
摘 要:松塔水电站工程是潇河流域上一座新建的综合性中型水利枢纽工程,在工程建设和运行中坚持以生态保护为基础,把保证生活和生态用水做为优先准则,对流域内的水文特征变化、地下水资源的保护与合理开发、生态环境的改善以及流域下游城镇生态环境的优化都将产生前所未有的积极意义。工程建成投入运行后,库区形成新的湿地生态环境,工程对流域上地表水的拦蓄和利用也将大大缓解区域内地下水严重超采的现状,而且还增加了对下游城镇生态、生活、工业用水的供给能力。因此,松塔水电站工程实现了生态工程、民生工程的目标。Songta hydropower station project is a new comprehensive medium-sized water conservancy project on the Xiaohe River.It bases on the understanding of the ecological protection during both the construction and operation period.Moreover,it always gives the priority to ensuring the quality of living water and ecological use of water.Hence,it will have positive and unprecedented effects on the hydrological characteristics changes of ecological environment in the river basin,protection and reasonable exploitation of groundwater resource,as well as the general improvement of ecological environment in the river basin area,especially in the downstream town area.After the project is completed and put into operation,there will be the formation of a new wetland ecological environment.At the same time,the efficient impoundment of the project of surface water and its use will greatly ease the situation of over exploitation of underground water,increasing the supply ability of ecological,living and industrial water in downstream towns.Therefore,Songta hydropower station project achieves the aims of ecological engineering and social welfare engineering.
分 类 号:TV213[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222