作 者:王哲 WANG Zhe(The First Engineering Co.,Ltd.of China Railway 22nd Bureau Group Co.,Ltd.,Harbin 150000,China)
机构地区:[1]中铁二十二局集团第一工程有限公司,哈尔滨150000
出 处:《中小企业管理与科技》2021年第9期190-191,共2页Management & Technology of SME
摘 要:站场咽喉改造需在不影响铁路运营的前提下在封锁点内完成。如何安全、高效、可行地完成施工任务,关键在于制定详细可行的方案,而施工组织是决定方案是否可行的关键。因此,论文结合哈尔滨站咽喉区组合道岔的施工情况,对施工组织设计及施工技术方案进行了论述。The reconstruction of station throat needs to be completed within the blockade point without affecting the railway operation.How to complete the construction task safely,efficiently,and feasibly,the key is to formulate a detailed and feasible plan,and the construction organization is the key to determining whether the plan is feasible.Therefore,the paper discusses the construction organization design and construction technology plan combined with the construction situation of the assembly turnout in the throat area of Harbin Station.
关 键 词:中心站咽喉改造 五渡六交复杂组合道岔 施工组织 施工步骤 运营 影响
分 类 号:U215[交通运输工程—道路与铁道工程]