老挝南俄3面板堆石坝结构安全和工程措施研究  

Study on Structural Safety and Engineering Measures of Lao Nam Ngum 3 CFRD

在线阅读下载全文

作  者:魏匡民[1,2] 李媛 李国英[1,2] 党振虎[3] 米占宽 WEI Kuangmin;LI Yuan;LI Guoying;DANG Zhenhu;MI Zhankuan(Geotechnical Engineering Dept,Nanjing Hydraulic Research Institute,Nanjing 210024,China;Key Laboratory of Failure Mechanism&Safety Control Techniques of Earth-Rock Dam of the Ministry of Water Resources,Nanjing 210029,China;Power China Northwest Engineering Co.,Ltd.,Xi'an 710065,China)

机构地区:[1]南京水利科学研究院岩土工程研究所,南京210024 [2]水利部土石坝破坏机理与防控技术重点实验室,南京210029 [3]中国电建集团西北勘测设计研究院有限公司,西安710065

出  处:《三峡大学学报(自然科学版)》2021年第2期8-13,共6页Journal of China Three Gorges University:Natural Sciences

基  金:国家重点研发计划重点专项(2017YFC0404904);中央级公益性科研院所基本科研业务费(Y319009,Y320005,Y320004)。

摘  要:在建的老挝南俄3面板堆石坝坝高达两百米级,已接近世界第一高面板堆石坝-水布垭面板堆石坝.南俄3大坝堆石料模量较低,后期变形偏大,面板可能存在挤压破坏、拉裂破坏、翘曲脱空等诸多问题,危害大坝安全.设计建设期工程技术人员就面板应力变形安全、坝体-地基摩擦接触效应、面板脱空等技术问题提出了质疑.本文通过三维有限元方法结合工程实践经验对该坝结构安全以及工程措施有效性进行了细致论证,结果表明,采用了设置压性缝、提高低高程部位混凝土标号和配筋率、控制预沉降时间等措施后大坝结构安全是有保证的.本文详细阐述了南俄3大坝结构安全论证过程以及采取工程措施的必要性,研究方法和技术路线可为海外高土石坝工程的设计、计算、建设提供借鉴.The Laos Nam Ngum 3 is a 200 m high CFRD dam that under construction.The height of the dam is close to the world's tallest CFRD,namely the Shuibuya CFRD,and the dam material modulus is low,therefore the creep deformation may be large.There are many problems(such as,compressive failure,tensile failure,separation between the slab and the cushion,etc.)endanger the safety of the dam.During the design and construction period,the engineers raised questions about the stress safety of the slab,the frictional contact effect between the dam body and the foundation,and the separation between the slab and the cushion.This paper used a 3D finite element method combing with the engineering practice and conducted a detailed demonstration of the safety evaluation of the dam structure and engineering measures.Results show that the safety of the dam structure was ensured after taking measures such as,setting compression joints,improving the concrete strength,enhancing the reinforcement of the slab,and controlling the pre-settlement time.The methods and technical routes used in this paper can provide references for the calculation and analysis of earth-rock dam abroad.

关 键 词:面板堆石坝 结构应力 面板脱空 工程措施 

分 类 号:TU45[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象