检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网安徽省电力有限公司芜湖县供电公司,安徽芜湖241100
出 处:《科学技术创新》2021年第9期164-165,共2页Scientific and Technological Innovation
摘 要:在现有电路停电检修过程中,电路检修位置和接地位置是分布在不同的电线杆上的,检修工人在停电工作前期需要重复在不同地点进行多次上下杆拉开关,以便挂接地线工作,使得停电周期严重加长,劳动强度较大,存在安全隐患;本文设计了一种V型电闸结构,并进行了SolidWorks软件三维建模,能够有效地解决上述问题,减少线路故障检修停电时间。In the process of power outage maintenance of existing circuits,the circuit maintenance positions and grounding positions are distributed on different poles.In the early stage of power outage work,maintenance workers need to repeatedly pull up and down poles at different locations for multiple times to connect the grounding wire.This makes the power outage period seriously prolonged,the labor intensity is high,and there are potential safety hazards;this paper designs a V-shaped switch structure and performs 3D modeling with SolidWorks software,which can effectively solve the above problems and reduce the power outage time for line fault maintenance.
关 键 词:V型电闸 电路检修 SolidWorks建模
分 类 号:TM754[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44