检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苗立业 MIAO Li-ye
机构地区:[1]辽宁水利土木工程咨询有限公司,辽宁沈阳110003
出 处:《东北水利水电》2021年第4期48-50,72,共4页Water Resources & Hydropower of Northeast China
摘 要:在水工隧洞施工中,不仅要重视工程的安全性,还应该兼顾工程的经济性。文章以辽宁省大风口水库新建输水隧洞为例,构建FLAC3D三维有限元模型,利用数值模拟的方法,对二次衬砌混凝土参数进行优化研究。根据研究成果,建议二次衬砌选用厚40 cm的C25混凝土。In the construction of hydraulic tunnel,we should not only pay attention to the safety of the project,but also give consideration to the economy of the project.In this paper,the FLAC3D three-dimensional finite element model is established by taking the newly-built water conveyance tunnel of Dafengkou Reservoir in Liaoning Province as an example.The parameters of secondary lining concrete are optimized by numerical simulation method.According to the research results,it is suggested that C25 concrete with a thickness of 40 cm should be used for the secondary lining.
分 类 号:TV554[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.184