检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:武志萍 WU Zhi-ping(China Railway 12th Bureau Group Investment Management Co.,Ltd.,Taiyuan 030024,China)
机构地区:[1]中铁十二局集团投资管理有限公司,太原030024
出 处:《价值工程》2021年第6期150-152,共3页Value Engineering
摘 要:本论文依托德都高速公路TJ10标玉堂南互通主线桥梁现浇梁工程,通过与传统的满堂支架以及钢管支墩的工艺对比,采用了荷载框架式SPS支撑系统施工大跨度现浇梁。无论是在质量上还是整体效果上都满足了现场施工,确保了节点工期,同时装配式施工安全有序,体现了工地标准化。This paper relies on the cast-in-place beam project of the main line bridge of Yutang South Interchange on Deyang-Dujiangyan Expressway TJ10.Compared with traditional full-floor brackets and steel pipe buttresses,the load frame SPS support system is used to construct large-span cast-in-place beams.Both in terms of quality and overall effect,the on-site construction is satisfied,ensuring the joint construction period,and the prefabricated construction is safe and orderly,reflecting the standardization of the construction site.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15