检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:温建磊 宋首元 WEN Jianlei;SONG Shouyuan(Shandong Power Construction Third Engineering Co.,Ltd.,Qingdao Shandong 266100)
机构地区:[1]山东电力建设第三工程有限公司,山东青岛266100
出 处:《中国科技纵横》2020年第15期87-88,共2页China Science & Technology Overview
摘 要:近年来立式高加越来越多的被超超临界百万千瓦机组使用,同卧式高加相比较,立式高加安装时的吊装方法和工艺具有自身的特点和要求,需要认真研究和总结.本文结合华电莱州二期等三个项目的立式高加吊装实践,对吊装工艺进行细部分析,对吊装准备和吊装过程中需要注意的问题进行总结,对吊装方案作出比较和探讨.In recent years,vertical high-pressure heaters have been increasingly used by ultra-supercritical million kilowatt units.Compared with horizontal high-pressure heaters,the hoisting methods and processes for vertical highpressure heaters have their own characteristics and requirements.Seriously study and summarize.In this paper,combined with the vertical high-pressure hoisting practices of the three projects of Huadian Laizhou Phase Ⅱ,the detailed analysis of the hoisting process is carried out;the hoisting preparation and the problems that need attention in the hoisting process are summarized,and the hoisting schemes are compared and discussed.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15