洛河组砂岩含水层下大采高工作面导水断裂带演化规律  被引量:4

Evolution law of water-conducting fault zone in large mining height working face under sandstone aquifer of Luohe Formation

在线阅读下载全文

作  者:杨玉亮[1,2] 徐祝贺 YANG Yuliang;XU Zhuhe(School of Coal Engineering,Shanxi Datong University,Datong 037003,China;School of Energy and Mining Engineering,China University of Mining&Technology(Beijing),Beiying 100083,China)

机构地区:[1]山西大同大学煤炭工程学院,山西大同037003 [2]中国矿业大学(北京)能源与矿业学院,北京100083

出  处:《煤矿安全》2021年第3期30-35,42,共7页Safety in Coal Mines

基  金:2019年大同市重点研发计划资助项目(2019025);2017年山西大同大学科学研究资助项目(2017K3)。

摘  要:针对旬耀矿区厚煤层大采高工作面上覆洛河组砂岩含水层下的安全采煤问题,采用理论分析、相似材料试验和数值模拟研究了某矿1109大采高工作面覆岩破断及裂隙演化规律。研究表明:上覆岩层经历了直接顶破断、基本顶初次破断与周期破断、亚关键层初次破断与周期破断5个阶段,破断发生引起工作面煤壁上方裂隙密度和开度发生跃变,采空区覆岩裂隙经历孕育、产生、张开、闭合、压实5个动态阶段;从开切眼到充分采动过程中,在裂隙带的上部、工作面煤壁上方及开切眼上方裂隙较为发育,裂隙区近似"抛物线"状,采空区中部覆岩裂隙闭合而边界处裂隙不易闭合;工作面充分采动后,导水断裂带发育高度82~85 m,未导通上覆洛河组砂岩。Aiming at the problem of safe coal mining under the sandstone aquifer covering Luohe Formation in the thick coal seam mining face of Xunyao Mining Area, theoretical analysis, similar material test and numerical simulation were used to study the overlying rock fracture and fracture evolution of large mining height in 1109 mining face. The results indicate that: under the condition of fully mechanized caving mining, overburden strata has experienced 5 changes, immediate roof broken, basic roof broken, basic roof periodic broken, key strata broken and key strata periodic broken. The density and width of fracture above working face will have a leap when the overburden rock is broken. In this process, the mining-induced fractures also have experienced 5 dynamic changes: preparation, production, stretch, close and compaction;many cracks will generate on fracture zone top, working face top and open-off cuts top in the course from open-off cuts to the full mining stage. The crack area which spreads around compacting area is parabolic shape. Namely, the cracks in central zone of overburden strata will close easily but the cracks in border zone will not;after the working face is fully excavated, the height of the water-conducting fissure zone is about 82 m to 85 m, and the sandstone overlying Luohe Formation is not connected.

关 键 词:洛河组砂岩 大采高工作面 导水断裂带 相似材料试验 数值模拟 

分 类 号:P641[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象