检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:辛业春[1] 王延旭 李国庆[1] 王朝斌[1] 王尉 Xin Yechun;Wang Yanxu;Li Guoqing;Wang Chaobin;Wang Wei(Key Laboratory of Modern Power System Simulation and Control&Renewable Energy Technology Ministry of Education,Northeast Electric Power University,Jilin 132012,China)
机构地区:[1]东北电力大学现代电力系统仿真控制与绿色电能新技术教育部重点实验室,吉林132012
出 处:《电工技术学报》2021年第8期1681-1692,共12页Transactions of China Electrotechnical Society
基 金:国家自然科学基金资助项目(U2066208)。
摘 要:三电平变流器控制系统采用有限集模型预测控制(FCS-MPC),滚动优化需要遍历所有开关状态,针对其导致处理器运算量增加、处理时间长的问题,提出一种T型三电平并网逆变器优化计算量的FCS-MPC方法。通过构建基于电压预测的单目标代价函数,避免设计权重系数问题,减化单次寻优的步骤;根据直流母线电位分布选择冗余小矢量,实现中点电位平衡,使每个控制周期的预测次数减小至3次,提高寻优效率。有限控制集在预测过程中将所包含矢量的加权误差二次方最小作为依据划分,并利用矢量角补偿系统延迟,提高预测精度,使并网电流质量得到改善。搭建基于RT-Lab的功率硬件在环仿真系统和物理装置验证所提控制策略,实验结果验证了所提理论分析的正确性和控制策略的有效性。Rolling optimization of Finite Control Set model predictive control(Finite Control Set-MPC,FCS-MPC)needs to traverse all the switch states in the three-level converter control system,which will cause the problems of increased processor calculation and long processing time.For this reason,this paper proposes a FCS-MPC method with optimized calculation amount of T-type three-level grid-connected inverter.By constructing a single objective cost function based on voltage prediction,the design of weighting factor is avoided and the steps of single optimization are reduced.For improving the efficiency of optimization,the redundant small vector is selected according to the DC bus potential distribution to balance the neutral-point potential and reduce the number of predictions per control cycle to 3 times.The finite control set is divided according to the minimum weighted error square of the included vectors in the prediction process,and the vector angle is used to compensate the system delay,thereby improving the prediction accuracy and the grid-connected current quality.A power hardware-in-the-loop simulation system based on RT-Lab and a physical device are established to verify the proposed control strategy.The results show that the proposed theoretical analysis is correct and the control strategy is effective.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.239.109