合肥市清一冲、清二冲初期雨水径流污染控制方案  被引量:2

Pollution Control Scheme of Rainwater Runoff in the Early Stage of Qingyichong&Qingerchong in Hefei

在线阅读下载全文

作  者:陈思 CHEN Si(Shanghai Urban Construction Design&Research InstituteCo.,Ltd.,Shanghai 200125,China)

机构地区:[1]上海市城市建设设计研究总院(集团)有限公司,上海200125

出  处:《中国市政工程》2021年第2期58-61,126,共5页China Municipal Engineering

摘  要:合肥市中心城区初期雨水径流污染问题突出,已成为影响地表水环境质量的主要因素之一。在排水系统末端设置调蓄池,可经济有效地控制初期雨水径流污染,降低面源污染对受纳水体水质的影响。以合肥市清一冲、清二冲初期雨水调蓄池设计为例,从设计规模、总体布置形式、进出水设计、冲洗系统设计和除臭设计等5个方面对调蓄池的工艺设计进行阐述,并对调蓄池运行模式和工程设计特点进行分析介绍,旨在为同类初期雨水调蓄池的设计和运行管理提供参考。The initial rainwater runoff pollution problem in the downtown area of Hefei was prominent,and it has become one of the main factors affecting the environmental quality of surface water.Setting up a storage tank at the end of the drainage system can effectively control the initial rainwater runoff pollution and reduce the impact of non-point source pollution on the water quality of the receiving water body.Taking the design of the initial rainwater storage tanks of Qingyichong&Qingerchong in Hefei as an example,the process design of the storage tanks is explained from five aspects:design scale,overall layout,water inlet&outlet design,flushing system design and deodorization design,the storage tank is analyzed&introduced on its operation mode&engineering design characteristics,aiming to provide references for the design&operation management of the initial rainwater storage tank of the same kind.

关 键 词:雨水泾流污染控制 初期雨水 调蓄池 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象