检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张恒 侯栋梁 Zhang Heng;Hou Dongliang
机构地区:[1]中铁二院重庆勘察设计研究院有限责任公司,重庆400023
出 处:《重庆建筑》2021年第4期19-20,共2页Chongqing Architecture
摘 要:该文结合城市站区规划,对渝利铁路沙子站既有条件进行深入分析后,通过在该站增设客运设施工程来办理客运作业,从而改善石柱旅游核心资源大黄水片区景点的外部交通条件,减少游客出行时间、优化出行体验、提高景区吸引力,可为类似工程设计参考。In this paper,combined with the urban station area planning,an in-depth analysis of the existing conditions of the Shazi Station on Yuli Railway was conducted.Through adding passenger transport facilities at the station to handle passenger transportation operations,the external traffic conditions of the scenic spots in the Dahuangshui area,the core tourism resource of Shizhu,will be improved,reducing the travel time of tourists,optimizing their travel experience,and increasing the attractiveness of the scenic spot,which can be a reference for similar project design.
分 类 号:U218[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.207.174