检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]重庆建工第十一建筑工程有限责任公司,重庆400039
出 处:《重庆建筑》2021年第4期52-54,共3页Chongqing Architecture
摘 要:装配式建筑的发展带来了建筑业的极大进步,同时也出现了不少问题,叠合板后浇板带漏浆就是其中一个常见问题。该文通过对后浇板带进行研究,总结出一种新的采用T型螺杆与支承钢管对拉的无支撑体系施工工艺,很好地解决了叠合板后浇板带漏浆问题,同时有效节约了施工成本,可为同类工程项目提供参考。The development of prefabricated buildings has greatly promoted that of the construction industry,but quite a few problems have emerged as well.Slurry leakage in the post-cast strip on laminated slab is one of the common problems.Based on the study of the post-cast strip,this paper summarized a new construction technology of the unsupported system,which adopts T-shaped screw pipes and supporting steel pipes for counter-pulling.Thus,the problem of slurry leakage in the post-cast strip on laminated slab is well solved,with the construction cost effectively saved,which can provide reference for similar engineering projects.
分 类 号:TU756.44[建筑科学—建筑技术科学] TU74
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229