检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何一凡 He Yifan(Shanghai Municipal Engineering Cost Consulting Co.,Ltd.,Shanghai,200092)
机构地区:[1]上海市政工程造价咨询有限公司,上海200092
出 处:《建设科技》2021年第5期68-70,74,共4页Construction Science and Technology
摘 要:随着BIM技术在建筑领域应用的不断深入,BIM模型承载的设计信息逐渐丰富,具备了从模型中直接获取工程量清单的条件。本文比较了三种基于BIM设计模型提取基坑围护结构工程量清单的方法,对比了每种方法存在的优缺点,总结了每种方法的适用范围。本文为造价人员选取合适的BIM技术路径提供了一定参考。The application of BIM technology in the field of construction continues to deepen,and the design information carried by the BIM model is gradually enriched,which has the prerequisite for obtaining the bills of quantity directly from the model.This paper compares three methods of calculating the engineering quantity list of foundation pit retaining structure based on design BIM model,analyses the advantages and disadvantages of each method,and summarizes the scope of application of each method.This paper can provide a reference for the cost engineer to select the appropriate BIM technology path.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147