堆取料机回转支承顶升法更换工艺  被引量:1

Slewing bearing jacking method for replacement for stacker-reclaimer

在线阅读下载全文

作  者:吴华兵 Wu Huabing

机构地区:[1]马鞍山港口(集团)有限责任公司,马鞍山243023

出  处:《起重运输机械》2021年第7期77-80,共4页Hoisting and Conveying Machinery

摘  要:顶升法更换方案是用4只液压同步顶放置在立柱下平台和门座之间的四角位置,将回转支承以上部分顶起,使回转支承与立柱平台、门座分离,拆除、更换回转支承。与采用汽车吊拆除回转支承以上的部分,更换回转支承以后再重新安装的工艺相比,顶升法具有更换成本低、工期短、安全可靠、操作方便等优点。Jacking method for replacement is to place four hydraulic synchronous jacks at the four corners between the platform and the portal under the upright,and jack up the upper part of the slewing bearing to separate the slewing bearing from the upright platform and the portal,so as to remove and replace the slewing bearing.Compared with the method of removing the part above the slewing bearing by a truck crane,replacing the slewing bearing and then reinstalling the removed part,the jacking method for replacement has advantages of low replacement cost,time saving,safety,reliability and convenient operation.

关 键 词:堆取料机 顶升法 回转支承 更换工艺 

分 类 号:U653.928.5[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象