检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陶思海 TAO Sihai(Shanghai Geological&Mineral Engineering Investigation Co.,Ltd.,Shanghai 200065,China)
出 处:《路基工程》2021年第2期153-157,共5页Subgrade Engineering
摘 要:基于宁波地铁4号线类矩形盾构隧道区间段地表沉降实测数据,采用Peck公式并结合最小二乘法和回归分析方法,得到最大地表沉降实测值S_(max_实测)、最大地表沉降拟合值S_(max_拟合)、沉降槽宽度i、宽度系数K及地层损失率Vl统计结果,并分析了宽度系数K、地层损失率Vl以及修正系数α和β的分布规律,确定了建议值。Based on the measured data of ground settlement caused by quasi-rectangular shield of Ningbo Metro Line 4,this paper uses Peck formula,least square method and regression analysis method to obtain the measured data of the maximum ground settlement S_(max_实测),fitted value of the maximum ground settlement S_(max_拟合),width of settlement groove i,width coefficient K and formation loss rate Vl,and analyzes the width coefficient K,formation loss rate Vl and distribution rules of correction coefficient α and β.The recommended values are determined finally.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.120