检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王宾[1] 李志中 董新洲[1] WANG Bin;LI Zhizhong;DONG Xinzhou(State Key Lab of Control and Simulation of Power Systems and Generation Equipments(Department of Electrical Engineering,Tsinghua University),Haidian District,Beijing 100084,China)
机构地区:[1]电力系统及发电设备控制和仿真国家重点实验室(清华大学电机系),北京市海淀区100084
出 处:《中国电机工程学报》2021年第5期1608-1617,共10页Proceedings of the CSEE
基 金:国家重点研发计划项目(2016YFB0900600);国家电网公司科技项目(SGAH0000TKJS1900055)。
摘 要:为解决交流系统大扰动下电流源型直流输电(line commutate converter based HVDC,LCC-HVDC)系统电磁暂态精度响应实时求取困难的问题,该文基于动态相量法仿真框架,详细讨论了大扰动下LCC-HVDC直流输电系统的建模方案,并针对工程现场的计算精度与计算复杂度要求和逆变侧容易发生的换相失败现象,重构了易于拓展的仿真模型计算框架。多故障场景的仿真对比实验表明,与传统的动态相量仿真方案相比,所提出的框架能够准确反映直流系统在逆变侧交流系统受扰下的暂态响应特征,同时提高了计算速度,实现了LCC-HVDC系统暂态响应的高精度、实时化计算。In order to solve the problem of real-time calculation of electromagnetic transient response of line commutate converter based HVDC(LCC-HVDC) system with high accuracy under large disturbance, the modeling method of LCC-HVDC transmission system was discussed in detail based on dynamic phasor method. Aiming at the requirement of calculation accuracy and complexity in engineering field, with the common commutation failure phenomenon at the inverter side under consideration, an easy-to-expand simulation model calculation framework was reconstructed. Multi-scene simulation experiments indicated that compared with the traditional dynamic phasor simulation scheme, the proposed framework can accurately reflect the transient response characteristics of the LCC-HVDC system under large disturbance of the AC system at the inverter side, while improving the calculation speed, and realizing the real-time calculation of the transient response of the LCC-HVDC system with high accuracy.
关 键 词:电流源型直流输电 动态相量法 暂态响应 换相失败 实时仿真计算
分 类 号:TM744[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49