桥巩水电站黑启动电源设计  

Design of black start power source for Qiaogong Hydropower Station

在线阅读下载全文

作  者:朱鸿儒 ZHU Hong-ru(China Energy Engineering Group Guangxi Electrical Power Design Institute Co.,Ltd.,Nanning 530007,China)

机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,南宁530007

出  处:《广西水利水电》2021年第2期95-97,共3页Guangxi Water Resources & Hydropower Engineering

摘  要:针对红水河桥巩水电站出现过全部机组停运的情况,论述了新增柴油发电机组作为黑启动电源的必要性。介绍了黑启动电源系统的布置和接入方式、结构和功能,提出了黑启动柴油机组的控制和保护措施。新增黑启动电源已稳定运行一年,提高了桥巩水电站保安电源的可靠性,确保了桥巩水电站的供电安全。Qiaogong Hydropower Station on Hongshui River had ever seen all generator units shut off.In view of this situation,the author discussed the necessity of increasing new diesel generator set as the power source of black start.An introduction was made on the arrangement,connecting mode,structure and function of black start power source system,the control and protection measures of diesel generator set.The new black start power source has operated stably for one year which upgrade the reliability of security power supply and ensure the power supply safety of Qiaogong Hydropower Station.

关 键 词:柴油发电机组 黑启动电源 区域电网供电 红水河桥巩水电站 

分 类 号:TV737[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象