粘贴钢板加固高桩码头轨道梁的时效性分析  被引量:1

Timeliness analysis of bonding steel plate to strengthen track beam of high-piled wharf

在线阅读下载全文

作  者:杨红娜 刘思国[2] 时闽生[2] YANG Hong-na;LIU Si-guo;SHI Min-sheng(Tianjin Transportation Engineering Quality and Safely Supervision Terminal,Tianjin 300384,China;CCCC Tianjin Port Engineering Institute,Co.,Ltd.,Tianjin 300222,China)

机构地区:[1]天津市交通运输工程质量安全监督总站,天津300384 [2]中交天津港湾工程研究院有限公司,天津300222

出  处:《中国港湾建设》2021年第4期4-8,共5页China Harbour Engineering

基  金:天津市交通运输科技发展计划项目(2018-b1)。

摘  要:依托高桩码头轨道梁粘贴钢板加固项目,分析加固后5 a内的2次空鼓率实测结果,确定了恶劣海洋环境下粘贴钢板与轨道梁共同工作的有效时间宜为3 a,应每年对轨道梁加固钢板进行除锈处理,粘贴钢板法对加固轨道梁侧面的适用性较差,加固使用5 a后轨道梁向陆侧空鼓率的增长较向海侧快。Relying on the project of bonding steel plate to strengthen track beam of high-piled wharf,the measured results of two hollowing rate within 5 years after reinforcement were analyzed,and the effective time for the bonding steel plate and track beam to work together in harsh marine environment was determined to be 3 years.The steel plate of the track beam should be derusted every year.The applicability of bonding steel plate method to strengthen the side of track beam was poor.After 5 years of reinforcement,the hollowing rate of track beam to the land side increases faster than to the sea side.

关 键 词:粘贴钢板加固法 高桩码头 海洋环境 空鼓率 有效时间 

分 类 号:U656.113[交通运输工程—港口、海岸及近海工程] U657.4[交通运输工程—船舶与海洋工程]

 