检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张军[1] 孙亚斌 钟雄华 ZHANG Jun;SUN Ya-bin;ZHONG Xiong-hua(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou,Guangdong 510230,China)
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230
出 处:《中国港湾建设》2021年第4期15-18,共4页China Harbour Engineering
摘 要:码头的可作业时间对于分析码头通过能力及优化总平面布置具有重要意义。文中给出了3种可作业时间的分析方法,对分析要点进行了说明。通过实例对考虑船舶全过程作业的可作业率分析方法的分析要素、步骤和注意事项等内容详细地论述,总结了该方法的分析要点及可拓展方向,为码头可作业时间的分析研究提供有益参考。The operational time of the wharf is an important parameter for the analysis of port throughput capability and the improvement of port general layout.In this paper,three analysis methods of operational time were given,and the analysis points were explained.The analysis elements,steps and attention points of the operability analysis method was discussed in detail considering the whole process of ship operation through an example,and the analysis points and development direction of the method was summarized,which provides a useful reference for the analysis and research of the operational time of the wharf.
关 键 词:港口作业 可作业时间 作业天数 不可作业率 时间序列
分 类 号:U691.31[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62