抽水蓄能电站洞室施工临时用电常见问题分析及对策  被引量:1

Analysis and Countermeasures of Common Problems in Temporary Power Consumption for CavernConstruction of Pumped Storage Power Station

在线阅读下载全文

作  者:于书洋 郝力民 曹迟 朱仲晏 YU Shu-yang;HAO Li-min;CAO Chi;ZHU Zhong-yan(Zhejiang Jinyun Pumped Storage Co.,Ltd.,Jinyun 321400,China)

机构地区:[1]浙江缙云抽水蓄能有限公司,缙云321400

出  处:《价值工程》2021年第8期92-93,共2页Value Engineering

摘  要:洞室施工临时用电受施工环境、人员素质等原因影响,用电安全隐患多,现场管理难度大,触电伤亡事故时有发生。本文以浙江缙云抽水蓄能有限公司筹建期洞室及道路工程为例,对洞室施工过程中常见的临时用电所存在的安全隐患进行梳理总结,分析问题产生的原因,提出可行性对策,旨在消除事故隐患,提高现场管理水平。Temporary power consumption in cavern construction is affected by construction environment,personnel quality and other reasons.There are many hidden dangers of power consumption,on-site management is difficult,and electric shock casualties often occur.This article takes the cave and road works of Zhejiang Jinyun Pumped Storage Co.,Ltd.as an example to review and summarize the potential safety hazards of temporary power consumption during the construction of the cave,analyze the causes of the problems,and propose feasible countermeasures.It aims to eliminate hidden dangers of accidents and improve the level of on-site management.

关 键 词:洞室施工 临时用电 抽水蓄能 

分 类 号:TV663.2[水利工程—水利水电工程]

 