检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱大鹏 Zhu Da-peng
机构地区:[1]安姆科包装(上海)有限公司,上海200090
出 处:《建筑技术开发》2021年第5期91-92,共2页Building Technology Development
摘 要:预应力高强度混凝土管桩施工的成桩方法,是使管桩在压桩机的自重和桩架上配重反作用力的共同作用下压入土中以形成基桩。该技术不仅能减少对周围环境的影响,且具有节能降耗的施工优势。主要结合预应力高强混凝土管桩的实际工程实例,简要分析了预应力高强混凝土管桩的施工原理和施工工艺,希望能为相关工作人员提供相关的工作经验加以借鉴,进而提升基坑工程的工程质量。The pile forming method of prestressed high strength concrete pipe pile construction is to make the pipe pile driven into the soil under the combined action of the self weight of the pile driver and the counterweight on the pile frame to form the foundation pile.The technology can not only reduce the impact on the surrounding environment,but also has the construction advantages of energy saving and consumption reduction.In this paper,combined with the actual engineering example of prestressed high-strength concrete pipe pile,the paper briefly analyzes the construction principle and construction technology of prestressed high-strength concrete pipe pile,hoping to provide relevant working experience for relevant staff to learn from,and then improve the construction quality of foundation pit engineering.
关 键 词:预应力高强混凝土管桩 施工管理 施工工艺
分 类 号:TU753.3[建筑科学—建筑技术科学] TU712
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28