改装FSRU系泊系统设计及计算分析  被引量:1

Design and Calculation of Mooring System for Refi tted FSRU

在线阅读下载全文

作  者:刘鹏[1] 何夏茵 陈忱[1] LIU Peng;HE Xia-yin;CHEN Chen(Marine Design&Research Institute of China,Shanghai 200011,China)

机构地区:[1]中国船舶及海洋工程设计研究院,上海200011

出  处:《船舶》2021年第2期93-98,共6页Ship & Boat

摘  要:为满足某LNG运输船改装FSRU项目的设计要求,确保FSRU后续作业过程的安全,针对船型特点及作业海域特性,对多点系泊系统的各组成部分进行分析及选型,采用系泊计算软件对风、浪、流环境下改造后的系泊系统进行时域耦合分析,得到各工况下缆绳和锚最大受力及最大位移,结果表明:改装后的系泊缆绳和锚能够满足工程使用需要,船体位移控制较好,满足强度要求。研究的相关结论也可为其他类似项目的设计提供一定参考。The components of the multi-point mooring system are analyzed and selected according to the characteristics of the ship type and the operation sea area,in order to meet the design requirement of refi tting a LNG carrier to a FSRU and to ensure the safety of the follow-up operation of the FSRU.A time-domain coupling analysis is carried out for the refi tted mooring system under the environments of wind,wave and current by using the mooring calculation software,resulting in the maximum force and maximum displacement of the mooring line and anchor under the various operation conditions.The results show that the refi tted mooring line and anchor can meet the engineering requirement,and the hull can meet the strength requirement due to the better controlled hull displacement.The relevant conclusions can also provide references for the design of other similar projects.

关 键 词:浮式储存及再气化装置 多点系泊 系泊分析 锚选型 

分 类 号:U667[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象