检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵立庭 孙乙升 吕游 ZHAO Liting;SUN Yisheng;LU You(Beijing Jingmi Water Diversion Management Office,Beijing 101400,China)
出 处:《水利建设与管理》2021年第4期47-51,共5页Water Conservancy Construction and Management
摘 要:溢洪道金属结构的运行状态对水库工程的安全运行至关重要。本文依据现行金属结构检测规范,采用多种检测设备,对怀柔水库东西溢洪道闸门进行外观、锈蚀量、焊缝超声波探伤和材料检测,对启闭机运行状态进行检测和试验。基于检测结果,对溢洪道金属结构安全状态进行综合评价,对存在的问题提出修复建议,评价结果可为怀柔水库的安全运行和改造维护提供技术支撑。The operation state of the spillway metal structure is very important to the safe operation of the reservoir project.Many test devices are adopted for appearance,erosion,welding seam ultrasound fault detection and material test of the east-west spillway gate in Huairou Reservoir according to existing metal structure test codes.The hoist operation state is tested and detected.The safety state of the spillway metal structure is comprehensively evaluated based on the test results.Repair suggestions are proposed aiming at the existing problems.The evaluation results can provide technical support for the safe operation and reconstruction maintenance of Huairou Reservoir.
分 类 号:TV34[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.45.209