既有列检库墙体拆除安全质量控制分析  

Analysis on Safety and Quality Control of Wall Demolition of Existing Train Inspection Depot

在线阅读下载全文

作  者:俞江波 YU Jiangbo(Municipal Environmental Protection Engineering Co.,Ltd.of CREC Shanghai Group,Shanghai,201101,China)

机构地区:[1]中铁上海工程局集团市政环保工程有限公司,上海201101

出  处:《工程建设(维泽科技)》2021年第3期9-11,共3页Engineering Construction

摘  要:上海市轨道交通7号线定修段改扩建工程,上海轨道交通7号线于2010年2月20日正式运营,从宝山区美兰湖站起穿越市中心城区至浦东新区花木路站。线路全长44.35km,共设有33座车站。全线设有陈太路定修段和龙阳路停车场,其中陈太路定修段原设计预留18列位停车列检位,为提高7号线运能,7号线增购列车后,需提前实施陈太路定修段远期预留的停车列检库进行扩建,以满足增购列车的停放列检需要。Shanghai Rail Transit Line 7 was officially put into operation on February 20,2010,starting from Meilanhu station in Baoshan district and passing through the downtown area to Huamulu station in Pudong New Area.The total length of the line is 44.35km,with 33 stations.Chentai road regular repair section and Longyang road parking lot are set up in the whole line.In the original design of Chentai road regular repair section,18 train parking spaces are reserved.In order to improve the transportation capacity of line 7,after the additional trains of line 7 are purchased,the long-term reserved parking train inspection depot of Chentai road regular repair section needs to be expanded in advance to meet the parking train inspection needs of the additional trains.

关 键 词:墙体拆除 安全质量 施工工艺 

分 类 号:TU714[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象