检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡振栋 HU Zhendong
机构地区:[1]上海嘉定水务工程设计有限公司,上海市202009
出 处:《城市道桥与防洪》2021年第4期101-103,共3页Urban Roads Bridges & Flood Control
摘 要:通过对具体项目地下公共工程防汛影响专项论证的必要性进行分析,分别对施工期和使用期作了防汛安全影响研究。利用有限元软件分析工程施工期对周边防汛设施的影响,并针对该地下公共工程施工期和使用期存在的防汛安全隐患提出了合理化建议,最终给出了防汛论证的结论。Based on the analysis of the necessity of the special demonstration of the impact of flood control on the underground public works in specific project,The flood control safety impact during the construction period and the service period is studied respectively.The finite element software is used to analyze the impact of the construction period on the surrounding flood control facilities.Some reasonable suggestions are put forward for the hidden dangers of flood control safety during both of the construction period and service period of the underground public works.Finally,the conclusion of flood control demonstration is drawn.
分 类 号:TV87[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7