检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:沈智敏 闫毅志[1] 刘晓嫚 马晓青 SHEN Zhi-min;YAN Yi-zhi;LIU Xiao-man;MA Xiao-qing(Faculty of Electric Power Engineering,Kunming University of Science and Technology,Kunming 650504,China)
机构地区:[1]昆明理工大学电力工程学院,云南昆明650504
出 处:《水电能源科学》2021年第4期68-71,共4页Water Resources and Power
摘 要:采用ADINA有限元软件建立三维的拱坝-库水-淤沙-地基耦合模型,分别以人工合成地震波水平记录计算输入的单向及双向地震波,改变激励方向,分析了坝体、坝基的位移及应力响应。结果表明,双向输入地震波下,拱坝体系各监测点的位移和应力响应明显大于单向输入时的情况,同时,位移和应力的最大值与激励角度有关,最不利输入角度处于-40°~-90°之间。The three-dimensional coupling model of arch dam-reservoir water-silt-foundation was established by using finite element software ADINA.The input unidirectional and bidirectional seismic waves were recorded and calculated by using synthetic seismic waves horizontally.The excitation direction was changed,the displacement and stress response of the dam body and foundation were analyzed.The results show that the displacement and stress responses of the monitoring points of the arch dam system under the bidirectional input are obviously larger than those under the unidirectional input.Meanwhile,the maximum displacement and stress are related to the excitation angle,and the most unfavorable input angle is between -40° and -90°.
分 类 号:TV312[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145