检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李昱 郑宏伟 陈玉龙 费照骅 LI Yu;ZHENG Hongwei;CHEN Yulong;FEI Zhaohua(Jiangsu Taihu Planning and Design Institute of Water Resources Co.,Ltd.,Suzhou 215100,China;Changzhou Water Conservancy Construction Investment and Development Co.,Ltd.,Changzhou 213000,China)
机构地区:[1]江苏省太湖水利规划设计研究院有限公司,江苏苏州215100 [2]常州市水利建设投资开发有限公司,江苏常州213000
出 处:《江苏水利》2021年第4期12-15,共4页Jiangsu Water Resources
摘 要:现有规范规定的不冲不淤的流速限值是基于梯形渠道断面提出的,太湖流域骨干引排工程常采用坡墙结合的复式断面,其适用性有待进一步研究验证。采取数值模拟的方法,以白屈港河道综合整治工程为例,对河道不冲流速的限值进行了计算探讨。研究表明:对于非黏性土的复式断面河道,其允许不冲流速的计算水深可按照河底水深选取。The non-scouring and non-silting velocity limit value stipulated by existing code was based on trapezoidal channel section. The composite section of slope-wall combination was often used in backbone diversion and drainage project of Taihu Basin,and its applicability needed to be further studied and verified. Taking the comprehensive regulation project of Baiqugang River as an example,the numerical simulation method was adopted to calculate and discuss the limit value of river non-scouring velocity. The research showed that for the non-cohesive composite cross-section river,the calculation depth of the allowable non-scouring velocity could be selected according to the river bottom depth.
分 类 号:TV212[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.24