检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴双应[1,2] 邱毅 肖兰[1,2] Wu Shuangying;Qiu Yi;Xiao Lan(Key Laboratory of Low-grade Energy Utilization Technologies and Systems(Chongqing University),Ministry of Education of China,Chongqing 400044;School of Energy and Power Engineering,Chongqing University,Chongqing 400044)
机构地区:[1]重庆大学低品位能源利用技术及系统教育部重点实验室,重庆400044 [2]重庆大学能源与动力工程学院,重庆400044
出 处:《东北电力大学学报》2021年第1期31-40,共10页Journal of Northeast Electric Power University
基 金:重庆市技术创新与应用发展专项项目(cstc2019jscx-msxmX0213)。
摘 要:基于能量和质量平衡原理,建立光伏光催化型Trombe墙性能分析和评价的非稳态集总模型.研究了在冬季运行模式下,不同的室内外环境温度对系统性能和功能的影响.结果表明:文中建立的性能分析和评价模型是可行的;随着室外环境温度的降低和室内温度的升高,光伏光催化型Trombe墙的热效率、日产生的净化空气量和总效率均下降,其中最大总效率从55.3%减小到43.4%,而发电量和电效率变化较小.室内或室外温度的上升都会使光伏光催化型Trombe墙的空气出口温度上升,甲醛降解效率提高.在10:00之前或16:00之后,太阳辐射强度较低时,存在光伏光催化型Trombe墙功能失效情况;室外环境温度越低,室内温度越高,光伏光催化型Trombe墙的有效运行时间越短.Based on energy and mass balances,an unsteady lumped model for the performance analysis and evaluation of PV-PC-Trombe wall was established to study the influences of different indoor and outdoor environmental temperatures on the system performance and functionality in winter operating mode.The results show that the performance analysis and evaluation model established in this paper is feasible.As the outdoor temperature decreases or the indoor temperature increases,the thermal efficiency,the daily clean air volume and the total system efficiency of the PV-PC-Trombe wall all go down,and the maximum total efficiency decreases from 55.3%to 43.4%,while the change in power generation and electrical efficiency is little.The increasing of indoor or outdoor temperature will increase the air outlet temperature and formaldehyde degradation efficiency of the PV-PC-Trombe wall.Before 10:00 or after 16:00,when the solar radiation intensity is low,there is a function failure of the PV-PC-Trombe wall;the lower the outdoor ambient temperature and the higher the indoor temperature,the shorter the effective operating time of the PV-PC-Trombe wall.
关 键 词:光伏 光催化 Trombe墙 环境温度 性能和功能
分 类 号:TM615[电气工程—电力系统及自动化] TK519[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.82.179