检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘修刚 莫海涛 祁宏军 黄巍 LIU Xiu-gang;MO Hai-tao;QI Hong-jun;HUANG Wei(Xi′an Research Institute,China Coal Technology and Engineering Group,Xi′an 710077,China)
机构地区:[1]中煤科工集团西安研究院有限公司,西安710077
出 处:《煤炭技术》2021年第3期115-117,共3页Coal Technology
摘 要:为解决古汉山矿15081工作面水害及确保工作面高效安全生产,采用地面精准定向钻孔技术与地面注浆技术对二1煤层底板L8灰岩实施加固。针对精准定向钻孔技术、地面注浆的注浆设备、注浆工艺流程、注浆量计算方法及注浆结束标准及封孔进行分析与研究,分析与阐述了古汉山矿15081工作面注浆量影响因素及解决方案。In order to solve water damge and ensure the efficient and safe production for the 15081 working face of Guhan mountain mine,it is proposed to using the ground accurately directional drilling grouting technology to reinforce 2nd coal seam L8 floor limestone.Accurately directional drilling technology,grouting equipment,calculation method of grounting amount and grouting end standard and sealing are analyzed and studyed for the project,at the same time,the influencing factors and solutions of the grouting amount of 15081 working face in Guhan mountain mine are analyzed and explained.
分 类 号:TD745[矿业工程—矿井通风与安全] TD265.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49