检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹腾飞[1] CAO Tengfei(Jiangxi Provincial Institute of Water Sciences, Nanchang 330029, China)
出 处:《水电与新能源》2021年第4期21-23,27,共4页Hydropower and New Energy
摘 要:根据2018年水利部、发展改革委等国家四部委印发的《关于开展长江经济带小水电清理整改工作的意见》,狠抓小水电清理整改与绿色改造。针对江西省的实际情况,近期以不低于河道天然多年平均流量的10%作为生态流量;对部分水资源丰沛的河流,近期按30%计;中期按丰水期、平水期、枯水期分别进行生态需水的计算。远期按引入数学模型对不同河流的水生植物、水生动物、水体自净能力等计算得出的生态流量。In the“Opinions on the cleaning up and rectification of small hydropower stations in Changjiang River Economic Belt”issued by the Ministry of Water Resources and the National Development and Reform Commission,rectification and renovation of small hydropower stations are emphasized.The rectification work in Jiangxi Province is introduced from three important aspects,including the ecological flow,discharge facility and supervision platform construction.Considering the actual conditions of Jiangxi Province,the short-term ecological flow should be no less than 10%of the annual average natural flow of the rivers.For rivers with abundant water resources,it should be no less than 30%.For the intermediate term,the ecological water demand should be calculated separately according to the wet season,normal season and dry season.For the long term,it should be calculated with mathematical model considering the aquatic plants and animals and the self-purification capacity of different rivers.
分 类 号:TV742[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28