检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郑勇 ZHENG Yong(Power Plant of Pingdingshan Ruiping Coal Power Co.,Ltd.,Pingdingshan 467000,China)
机构地区:[1]平顶山市瑞平煤电有限公司电厂,河南平顶山467000
出 处:《电气传动自动化》2020年第6期52-54,共3页Electric Drive Automation
摘 要:传统发电厂电力设备时变停运模型在实际应用中存在计划维修时间与实际维修时间相差较大等问题,影响电力设备相关运行的决策和实施。本文研究了基于检修态切换的发电厂电力设备时变停运模型,构建了发电厂电力设备时变停运模型整体结构,分析了发电厂电力设备时变停运状态,设计了基于检修态切换的发电厂电力设备时变停运模型方案。实验结果表明,该方案可有效缩短计划维修时间与实际维修时间之间的差距,可为后续相关决策提供可靠判断依据。The traditional time-varying outage model of power equipment in power plant has some problems in practical application,such as the large difference between the planned maintenance time and the actual maintenance time,which affects the decision-making and implementation of power equipment related operation.This paper studies the power plant power equipment time-varying outage model based on maintenance state switching,constructs the overall structure of power plant power equipment time-varying outage model,analyzes the power plant power equipment time-varying outage state,and designs the power plant power equipment time-varying outage model scheme based on maintenance state switching.The experimental results show that the scheme can effectively shorten the gap between the planned maintenance time and the actual maintenance time,and can provide reliable judgment basis for subsequent related decisions.
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.223.70