Prediction of Disc Cutter Life During Shield Tunneling with AI via the Incorporation of a Genetic Algorithm into a GMDH-Type Neural Network  被引量:16

在线阅读下载全文

作  者:Khalid Elbaz Shui-Long Shen Annan Zhou Zhen-Yu Yin Hai-Min Lyu 

机构地区:[1]Department of Civil and Environmental Engineering,College of Engineering,Shantou University,Shantou 515063,China [2]Key Laboratory of Intelligence Manufacturing Technology,Ministry of Education,Shantou University,Shantou 515063,China [3]Discipline of Civil and Infrastructure,School of Engineering,Royal Melbourne Institute of Technology,Melbourne,VIC 3000,Australia [4]Department of Civil and Environmental Engineering,The Hong Kong Polytechnic University,Hong Kong,China [5]State Key Laboratory of Internet of Things for Smart City,University of Macao,Macao,China

出  处:《Engineering》2021年第2期238-251,共14页工程(英文)

基  金:The research work was funded by“The Pearl River Talent Recruitment Program”in 2019(2019CX01G338);Guangdong Province and the Research Funding of Shantou University for New Faculty Member(NTF19024-2019),China.

摘  要:Disc cutter consumption is a critical problem that influences work performance during shield tunneling processes and directly affects the cutter change decision.This study proposes a new model to estimate the disc cutter life(Hf)by integrating a group method of data handling(GMDH)-type neural network(NN)with a genetic algorithm(GA).The efficiency and effectiveness of the GMDH network structure are optimized by the GA,which enables each neuron to search for its optimum connections set from the previous layer.With the proposed model,monitoring data including the shield performance database,disc cutter consumption,geological conditions,and operational parameters can be analyzed.To verify the performance of the proposed model,a case study in China is presented and a database is adopted to illustrate the excellence of the hybrid model.The results indicate that the hybrid model predicts disc cutter life with high accuracy.The sensitivity analysis reveals that the penetration rate(PR)has a significant influence on disc cutter life.The results of this study can be beneficial in both the planning and construction stages of shield tunneling.

关 键 词:Disc cutter life Shield tunneling Operational parameters GMDH-GA 

分 类 号:U455.39[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象