作 者:王业峰 白军[2] 高源 WANG Yefeng;BAI Jun;GAO Yuan(CITIC HIC Engineering and Technology Co.,Ltd.,Luoyang,China 471039;Xizang Agriculture and Animal Husbandry University,Linzhi 860000,China)
机构地区:[1]中信重工工程技术有限责任公司,河南洛阳471039 [2]西藏农牧学院,西藏林芝860000
出 处:《山东冶金》2021年第2期58-59,61,共3页Shandong Metallurgy
摘 要:针对烧结环冷机余热发电项目的烟气温度低、环冷机冒灰、低压蒸汽不能投运等问题,经采取烧结矿料层厚度及环冷机取气口处负压、降低循环风机频率、变更锅炉换热面蒸汽设计流程等调整措施,烟气温度达到设计值,环冷机冒灰问题明显改善,低压蒸汽正常投运,发电量由5.1 MW提高到7.5 MW以上。In view of the problems of low flue gas temperature,ash leakage from the circular cooler and the inability of low pressure steam to be put into the waste heat generation system,the adjustment measures such as the material thickness of sintered ore and negative pressure at the air outlet of circular cooler,reducing the circulating fan frequency and changing the steam design process of the heat exchanger of boiler are adopted.Finally,the flue gas temperature reaches the design value,the ash leakage problem of the circular cooler is obviously improved,and the low pressure steam is put into the waste heat generation system normally.Power generation is also increased from 5.1 MW to more than 7.5 MW.
分 类 号:TM617[电气工程—电力系统及自动化]