检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张品峰 Zhang Pinfeng(No.71 Engineering Dept.of China National Coal Group Corp.,Suzhou,Anhui 234000)
机构地区:[1]中煤第七十一工程处有限责任公司,安徽宿州234000
出 处:《江西煤炭科技》2021年第2期96-98,共3页Jiangxi Coal Science & Technology
摘 要:根据万福煤矿矿建二期工程施工需要、回风立井已经进行了部分永久装备且需施行全风压通风的基本条件,采用新型大设备配套,专门设计了一套吊桶提升排矸系统。对超出常规的大吊桶提矸系统布置采用了创新的设计验证方法,解决了井筒提矸并保持矿井全风压通风的问题。In accordance with the construction needs of the second phase of the Wanfu Colliery Construction,the return air shaft has been partially equipped with basic conditions of full air pressure ventilation.New large equipment is used to specially design a set of large kibble waste stone exhaust system.An innovative design verification method is adopted for the layout of the large kibble gangue system beyond the conventional,which solves the problem of gangue lifting in the shaft and maintaining full wind pressure ventilation in the mine.
分 类 号:TD724.6[矿业工程—矿井通风与安全] TD351
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.164.124