检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹东宁 CAO Dongning(China Enterprise Foundation Management Consulting Co.,Ltd.,Beijing 100000,China)
机构地区:[1]中企基业(北京)管理顾问有限公司,北京100000
出 处:《通信电源技术》2021年第2期214-216,共3页Telecom Power Technology
摘 要:用电信息采集建设过程中存在各种影响低压电力线载波采集成功率的因素,对采集运维、数据发行及线损计算等工作造成极大的困难。在简要分析电力线载波通信技术原理的基础上,从基础建设、地理位置与环境、集抄设备、载波通信、运行维护以及档案建设6个方面分析影响低压电力线载波采集成功率的因素,并针对突出问题提出一些建议,以期推动我国电力行业的发展。There are many factors that affect the success rate of low-voltage power line carrier acquisition in the construction of electricity consumption information collection,which causes great difficulties in collection and operation and maintenance,data issuance,and line loss calculations.Based on the brief analysis of the application principle of power line carrier communication technology,the author analyzes the factors influencing the success rate of low-voltage power line carrier acquisition from six aspects of infrastructure construction,geographical location and environment,centralized reading equipment,carrier communication,operation and maintenance,and file construction,and puts forward some targeted suggestions for the prominent problems,so as to promoting the development of China’s power industry.
分 类 号:TM73[电气工程—电力系统及自动化] TN913.6[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.124