装置大型化对高温油泵入口管道的影响及解决方案  

INFLUENCE OF LARGE-SCALE UNIT ON INLET PIPE OF HOT-OIL PUMP AND THE SOLUTIONS

在线阅读下载全文

作  者:莫云 Mo Yun(SINOPEC Engineering Incorporation,Beijing,100101)

机构地区:[1]中国石化工程建设有限公司,北京100101

出  处:《石油化工设计》2021年第2期59-61,I0004,共4页Petrochemical Design

摘  要:从介绍泵入口管道设计的原则入手,以某炼化企业的常减压&轻烃联合装置几台高温油泵入口管道为例,根据CASERII软件的受力分析结果展开关于管道布置优化方案的探讨,着重说明了泵入口管道柔性设计过程中遇到问题时的几个主要解决思路,即如何通过优化配管、改变管道壁厚及一些其他措施等来满足泵管嘴受力的要求。This paper introduces the design principles of pump inlet pipe,takes the inlet pipes of several hot-oil pumps in the CDU/VDU and light hydrocarbon complex of a refinery as an example,discusses the optimization schemes of piping layout based on the CASERII stress analysis results,and focuses on the solutions to the problems emerged during the flexibility design of pump inlet pipe,i.e.how to meet the requirements of pump nozzle stress by optimizing the piping layout,changing the pipe-wall thickness and taking some other measures.

关 键 词:热油泵 入口管道 管嘴受力 

分 类 号:TE9[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象