现有地铁出入口上方新建结构施工技术  

Construction Technology of Newly-built Structure above Subway Entrance in Operation

在线阅读下载全文

作  者:李俊 LI Jun(Shanghai Construction No.7 Group Co.,Ltd.,Shanghai 200050,China)

机构地区:[1]上海建工七建集团有限公司,上海200050

出  处:《价值工程》2021年第11期104-105,共2页Value Engineering

摘  要:将地铁车站的出入口与周围商业建筑修建成一个整体,可以改善地铁乘客的通行并节约土地,但商业建筑与其内部的地铁出入口的施工往往不是同时进行,会互相影响使用,本文结合上海市的一处紧邻地铁的工程,对地铁出入口上方新建结构的施工提出了新的思路,为类似工程的施工提供了参考。The entrances of the subway station are always integrated into the surrounding commercial buildings,which can improve the passage of subway passengers and save the space.However,the construction of commercial buildings and its internal subway entrances are often not carried out at the same time,which will affect the use of each other.This paper puts forward a new idea for the construction of the new structure above the subway entrance basing on a project adjacent to the subway in Shanghai,and provides a reference for the construction of similar projects.

关 键 词:地铁车站 商业建筑 地铁出入口 上部结构 钢平台 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象