复杂及困难条件下大尺寸、超重构件吊装方案  

Hoisting Plan for Large Size and Overweight Components under Complex and Difficult Conditions

在线阅读下载全文

作  者:陆春晓 LU Chun-xiao(The 4th Engineering Co.,Ltd.of China Railway 25th Bureau Group,Liuzhou 545007,China)

机构地区:[1]中铁二十五局集团第四工程有限公司,柳州545007

出  处:《价值工程》2021年第11期169-171,共3页Value Engineering

摘  要:某市政景观大桥跨越地质软弱的冲沟,桥梁顶部离地高度达48m,上构大尺寸、超重拱肋节段构件的吊装施工困难。本项目通过搭设施工钢便桥,科学制订拱肋的吊装方案,并周密组织施工。顺利、安全完成了拱肋构件的高空吊装作业。A municipal landscape bridge crosses a gully with weak geology.The height of the top of the bridge is up to 48m from the ground.It is difficult to hoist the large-size and overweight arch rib segments of the superstructure.In this project,through the construction of industrial steel temporary bridges,the hoisting plan of the arch ribs is scientifically formulated,and the construction is organized carefully.The high-altitude hoisting operation of the arch rib components was completed smoothly and safely.

关 键 词:刚架拱桥 拱肋吊装 便桥设计 验算 吊装施工 

分 类 号:TU758[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象