对6 kV厂用系统设备布置与防误操作的思考  

Consideration on Equipment Layout and Misoperation Prevention of 6 kV Auxiliary Power System

在线阅读下载全文

作  者:闫长平[1] 张旭东[1] YAN Changping;ZHANG Xudong(Huaneng Yuhuan Power Plant,Yuhuan 317604)

机构地区:[1]华能玉环电厂,浙江玉环317604

出  处:《电力安全技术》2021年第4期33-35,共3页Electric Safety Technology

摘  要:介绍两起因走错间隔发生误操作导致人身伤亡事故的惨剧,反思6 kV厂用系统设备排列上存在的不足,并提出优化建议,希望设计单位在设计过程中将防止运行人员误操作作为设计重点予以考虑,避免投运后运行人员误操作恶性事故的发生。This paper introduces two tragic accidents that cause casualties due to wrong interval and fault operation,rethinks profoundly on the shortcomings in the arrangement of 6 kV auxiliary power system equipment,and puts forward the optimization suggestions,in hoping for design organizations to take into account the prevention of error operation as a focus during design,and to avoid the occurrence of malignant accidents due to operators’false operation.

关 键 词:人身伤亡 6 kV厂用系统 误操作 设计 

分 类 号:TM621.7[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象