检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲁超 芮旭 LU Chao;RUI Xu(The Eighth Engineering Co.Ltd.of the First Highway Engineering Bureau of CCCC,Tianjin 300170,China)
机构地区:[1]中交一公局第八工程有限公司,天津300170
出 处:《工程建设与设计》2021年第9期118-120,共3页Construction & Design for Engineering
摘 要:现阶段,我国公路桥梁工程的施工难度越来越大,如何降低施工难度、施工成本是我国建筑工程企业急需解决的问题。挂篮施工技术以其独有的设备投入少、技术含量高、预应力和弯矩分布合理的优势在桥梁工程悬臂施工中广泛应用。结合重庆三环高速长合路龙溪嘉陵江特大桥9^(#)墩挂篮施工现场情况,论文主要总结了挂篮拼装的工艺流程、安装施工过程中的注意事项和管控要点等,可为类似工程项目提供参考。At the present,the construction difficulty of highway and bridge engineering in China is becoming more and more difficult.How to reduce the construction difficulty and construction cost is an urgent problem to be solved by China's construction engineering enterprises.Basket construction technology is widely used in cantilever construction of bridge engineering because of its unique advantages such as less equipment input,high technical content and reasonable distribution of prestress and bending moment.Combining with the construction site of hanging basket on No.9 pier of Longxi Jialing river bridge on Changhe road of the third ring highway in Chongqing,this paper mainly summarizes the technological process of hanging basket assembly,matters for attention during installation and construction and key points of control,etc.,which can provide reference for similar projects.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222