检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邬佳成 张潭潭 WU Jiacheng;ZHANG Tantan(School of Civil Engineering,Changsha University of Science&Technology Changsha 410114,China)
出 处:《广东土木与建筑》2021年第5期91-94,共4页Guangdong Architecture Civil Engineering
摘 要:为快速确定钢箱梁斜拉桥的合理成桥索力,现以某航道桥为工程背景,采用最小弯曲能量法求解成桥索力,成桥控制目标设置为主梁弯矩和主塔偏移量,通过控制主梁截面应力和桥塔位移,来对成桥索力进行优化。最后通过空间有限元软件Midas/civil进行建模分析,验证了主梁为钢箱梁时采用该方法优化索力的可行性,可快速得到较为合理的成桥状态。In order to solve the reasonable finished cable force of steel box girder cable-stayed bridge quickly,taked one waterway bridge as the engineering background.Furthermore,the minimum bending energy method was utilized to solve the cable force.The control target of the completed bridge state is set as the bending moment of the main beam and the main tower offset.The cable force of the bridge is optimized by controlling the section stress of the main beam and the displacement of the bridge tower.Finally,the spatial finite element software Midas/civil is used for modeling and analysis.On this basis,the feasibility of this method is verified in optimizing the cable force when the main girder is steel box girder.And a more reasonable completed bridge state can be obtained quickly.
关 键 词:斜拉桥 索力优化 最小弯曲能量法 影响矩阵 成桥状态
分 类 号:U442.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.207.122