检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王雷[1] WANG Lei(Harbin Electric Machinery Factory Co.,Ltd.,Harbin 150040)
机构地区:[1]哈尔滨电机厂有限责任公司,哈尔滨150040
出 处:《现代制造技术与装备》2021年第4期184-185,共2页Modern Manufacturing Technology and Equipment
摘 要:随着我国水电站项目的增多,国家对水轮发电机组设备的安装质量要求日益提高。但是,因为市场上的安装企业数量较多,部分人员在安装过程中过于追求经济效益,缺乏对安装质量的重视,导致水电站运行时的很多问题都是由水轮发电机组设备的安装问题引起的。因此,探究水轮发电机组安装技术至关重要。With the increase of hydropower projects in our country,the country has put forward higher and higher standards for the installation quality of water turbine generator sets.However,due to the large number of installation enterprises in the market,some personnel pay attention to the realization of economic benefits in the installation process and lack of effective application of installation technology,many problems in the operation of hydropower stations are caused by water turbine generator sets It is caused by the installation problems of unit equipment.Therefore,it is very important to explore the installation technology of water wheel electric generator.
分 类 号:TV547.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28