检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于东晖[1] 高晋栋[2] 尧金金[2] 张致豪 司波[2] YU Dong-hui;GAO Jin-dong;YAO Jin-jin;ZHANG Zhi-hao;SI Bo(Beijing Institute of Architecture Design Co.,Ltd.,100045,Bejing,China;Building Construction Research Institute Co.,Ltd,100039,Bejjing,China)
机构地区:[1]北京市建筑设计研究院有限公司,北京100045 [2]北京市建筑工程研究院有限责任公司,北京100039
出 处:《建筑技术》2021年第5期534-536,共3页Architecture Technology
摘 要:张弦结构是大跨度预应力钢结构的主要形式,其中预应力施工是整体施工的关键步骤。国家会议中心二期工程屋盖采用预应力张弦拱壳结构,钢结构安装采用“累计滑移为主、吊装为辅”的安装方案;预应力拉索张拉采用分级张拉工艺,以索力控制为主,监测结构变形为辅。String structure is one of the main forms of long-span prestressed steel structure,in which pre-stressed construction is the key step of overall construction.China National Conference Center Phase Ⅱ adopts the pre-stressed string-beam structure.The steel structure of the project adopts the installation scheme of"cumulative slippage as the main part and hoisting as the auxiliary part".The pre-stressed cable tensioning adopts the graded tensioning process,cable force control is the main method,and structural deformation monitoring is the auxiliary method.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143