复杂节点钢柱制作技术  被引量:1

MANUFACTURING TECHNOLOGY OF STEEL COLUMNS WITH COMPLEX NODES

在线阅读下载全文

作  者:耿东禹 张雄边 王双伟 王小瑞 齐云轩 GENG Dong-yu;ZHANG Xiong-bian;WANG Shuang-wei;WANG Xiao-rui;QI Yun-xuan(China Construction Second Bureau Installation Engineering Co.,Ltd,100032,Bejjing,China;Beijing Beichen Exhibition Investment Co.,Ltd.,100101,Bejjing,China;Beijing Construction Engineering Group Co.,Ltd,100055,Bejing,China)

机构地区:[1]中建二局安装工程有限公司,北京100032 [2]北京北辰会展投资有限公司,北京100101 [3]北京建工集团有限责任公司,北京100055

出  处:《建筑技术》2021年第5期568-570,共3页Architecture Technology

摘  要:国家会议中心二期项目转换桁架两端的钢柱截面尺寸大,托座形状各异且节点复杂,节点隔板均为厚板,材料损耗大,焊接控制困难。针对以上难点,从材料采购、零件下料、装焊措施、打砂油漆等方面进行优化,保证了构件质量,节约了成本。The steel columns at both ends of the conversion truss of China National Conference Center Phase II have difficulties,such as large cross-sections,different shapes of brackets and complex nodes,thick joint partitions,large material loss,and difficult welding control.In view of the above difficulties,optimization was carried out in terms of material procurement,parts blanking,assembly and welding measures,sanding and painting,etc,to ensure the quality of components and save costs.

关 键 词:钢柱制作 材料采购 焊接 制作技术 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象