检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭莹[1] 刘艺 GUO Ying;LIU Yi(School of Materials Science and Engineering,Shaanxi University of Technology,Hanzhong 723001,China)
机构地区:[1]陕西理工大学材料科学与工程学院,陕西汉中723001
出 处:《热加工工艺》2021年第9期69-73,共5页Hot Working Technology
摘 要:对ZG20Mn横梁结构进行了分析,根据其结构特点设计了铸件的浇注系统、冒口、冷铁等,并利用Pro/E软件进行三维建模。应用ProCAST软件对铸造成形过程中的凝固缺陷进行了分析。结果表明,采用中间注入开放式浇注系统并选择导轨放置在上的浇注方案,有利于实现横梁铸件的顺序凝固。适当增大冷铁的尺寸可消除筋和横梁侧面交界部位的缩孔缩松缺陷。The structure of ZG20 Mn beam was analyzed.According to its structural characteristics,the casting gating system,riser,cold iron and so on were designed,and the Pro/E software was used for 3 D modeling.ProCAST software was used to analyze the solidification defects in the casting forming process.The results show that using the open pouring system with intermediate injection and selecting the pouring scheme of the guide rail placed on the upper part is beneficial to realize the sequential solidification of the cross beam castings.Properly increasing the size of the cold iron,the shrinkage cavities and shrinkage porosity defects at the junction of the rib and the side of the beam can be eliminated.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.193.179