检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘伟 Liu Wei(Yuecheng Coal Mine,Shanxi Jinneng Holdings Coal Group Qinxiu Company,Jincheng Shanxi 048006)
机构地区:[1]山西晋能控股煤业集团沁秀公司岳城煤矿,山西晋城048006
出 处:《机械管理开发》2021年第3期46-48,共3页Mechanical Management and Development
摘 要:针对岳城煤矿下组煤首采面资料不足,巷道顶板风化严重等情况,对巷道进行地质力学测试,确定顺槽130 m处顶板浅部3 m范围内为离层区域,对顺槽巷道和开切眼分别进行了支护设计。现场结果表明:巷道顶底板变化量和两帮移进量均在设计允许范围之内,巷道围岩保持了很好的完整性,提供的支护参数能满足生产和安全要求。In view of the shortage of coal mining data and serious weathering of roadway roof in Yuecheng Coal Mine,the geomechanical test of roadway is carried out to determine that the shallow part of roof is separated from the floor within 3 m of 130 m of Shun trough.The supporting design of roadway and opening hole is carried out respectively.The field results show that the variation of roadway roof and floor and the amount of two sides moving in are within the allowable range of design,the surrounding rock of roadway maintains good integrity,and the supporting parameters can meet the requirements of production and safety.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229