检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯朝祥 Hou Zhaoxiang(Zhenchengdi Mine of Shanxi Xishan Coal and Electricity Co.,Ltd.,Gujiao Shanxi 030203)
机构地区:[1]山西西山煤电股份有限公司镇城底矿,山西古交030203
出 处:《机械管理开发》2021年第3期88-90,共3页Mechanical Management and Development
摘 要:为进一步提升锚杆对井巷围岩变形的控制效果,应根据井巷实际地质、煤层等条件综合确定锚杆支护参数。以3号煤层所属工作面为例,在分析其地质、煤层等条件以及支护现状的基础上,建立数值模拟模型,着重对不同锚杆长度、锚杆直径以及锚杆间距对井巷围岩变形的控制效果进行对比分析,最终得出最佳锚杆支护参数。In order to further improve the control effect of anchor rod on the deformation of surrounding rock in roadway,the parameters of bolt support should be determined synthetically according to the actual geology and coal seam of roadway.Taking the working face of No.3 coal seam as an example,on the basis of analyzing its geological,coal seam and supporting status,a numerical simulation model is established to co MPare and analyze the control effect of different bolt length,bolt diameter and bolt spacing on the deformation of surrounding rock in roadway,and finally to obtain the best bolt support parameters.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46