分阶段整体顶升法在高铁站房屋面网架中的应用  被引量:7

Application of Staged Integral Jacking Method in the Construction of the Roof Truss of High Speed Railway Station Building

在线阅读下载全文

作  者:梁翼 邓兴 冯向阳 赵九龙 LIANG Yi;DENG Xing;FENG Xiangyang;ZHAO Jiulong(China Railway 11 Bureau Group Construction and Installation Engineering Co Ltd,Wuhan Hubei 430064,China;Finance and Accounting Department,Zhengzhou-Wanzhou Passenger Dedicated Line Henan Co Ltd,Zhengzhou Henan 450000,China;Safety and Quality Department,Zhengzhou-Wanzhou Passenger Dedicated Line Henan Co Ltd,Zhengzhou Henan 450000,China;Zhengzhou Construction Depot,China Railway Zhengzhou Group Co Ltd,Zhengzhou Henan 450003,China)

机构地区:[1]中铁十一局集团建筑安装工程有限公司,湖北武汉430064 [2]郑万铁路客运专线河南有限责任公司计划财务部,河南郑州450000 [3]郑万铁路客运专线河南有限责任公司安全质量部,河南郑州450000 [4]中国铁路郑州局集团有限公司郑州建筑段,河南郑州450003

出  处:《铁路技术创新》2021年第2期80-85,共6页Railway Technical Innovation

摘  要:铁路站房屋面常采用跨度大、面积大、质量大的钢网架结构,且内部空间复杂多样,给工程施工带来很大挑战。以郑阜铁路许昌北站为依托,采用分阶段整体顶升法解决了钢网架整体顶升稳定性、同步误差、纠偏控制及中间层阻碍等问题,保证了钢结构的安装精度,缩短了工期,有效提高了工程质量,减小了高空作业风险,可为类似工程提供参考借鉴。Railway station buildings are often made of large-span, large-area and large-mass steel trusses with complex and diverse internal space, bringing great challenges to engineering construction. This paper, by taking Xuchang North Railway Station of Zhengzhou-Fuyang High Speed Railway as an example, looks at the staged integral jacking method which solves the problems of integral jacking stability, synchronization error, deviation rectification control, and intermediate layer obstruction for steel trusses, thus ensuring the installation accuracy of the steel structure, shortening the construction period, effectively improving the project quality, and reducing the risk of operations at height. The study results can be provided as a reference for similar projects.

关 键 词:郑阜铁路 高铁站房 许昌北站 分阶段 整体顶升 屋面网架 

分 类 号:TU248.1[建筑科学—建筑设计及理论]

 