基于网格化的极端灾后配电网电力-通信协调恢复策略  被引量:22

Power-communication Coordination Recovery Strategy Based on Gridding Method After Disasters

在线阅读下载全文

作  者:陈彬[1,2,3] 于继来 周霞[4] 林沪生 CHEN Bin;YU Jilai;ZHOU Xia;LIN Husheng(School of Electrical Engineering and Automation,Harbin Institute of Technology,Harbin 150001,Heilongjiang Province,China;Electric Power Research Institute of State Grid Fujian Electric Power Corporation,Fuzhou 350007,Fujian Province,China;State Grid Cultivating Laboratory of Wind Resistance and Disaster Mitigation Under Severe Typhoon Environment(Electric Power Research Institute of State Grid Fujian Electric Power Corporation),Fuzhou 350007,Fujian Province,China;Institute of Advanced Technology,Nanjing University of Post and Telecommunication,Nanjing 210023,Jiangsu Province,China)

机构地区:[1]哈尔滨工业大学电气工程及自动化学院,黑龙江省哈尔滨市150001 [2]国网福建省电力有限公司电力科学研究院,福建省福州市350007 [3]国网强台风环境抗风减灾实验室(国网福建省电力有限公司电力科学研究院),福建省福州市350007 [4]南京邮电大学先进技术研究院,江苏省南京市210023

出  处:《电网技术》2021年第5期2009-2016,共8页Power System Technology

摘  要:极端自然灾害对配电网电力与通信系统会造成较大损害,配电网恢复过程中电力与通信系统相互影响、制约,两者的协调可能使配电网更有效、快速地恢复。为提高配电网灾后的恢复速度和效率,文章提出基于网格化的配电网灾后电力与通信协调恢复方法。首先根据移动基站与电力节点的对应关系划分配电网多级网格,以抢修时间短和停电损失小为目标分别建立配电网电力-通信协调恢复模型;其次分解灾后配电网系统的恢复过程,提出紧急通信优先恢复的电力-通信协调恢复方法,在此基础上提出一种基于网格划分的配电网电力-通信协调恢复策略;最后以IEEE33节点配电网系统为例验证了该方法的合理性和有效性。Extreme natural disasters will cause great damage to the power and communication systems of the distribution network.During the restoration process of the distribution network,the power and communication systems interact and restrict each other.The coordination of the two can make the distribution network restore effectively and quickly.In order to improve the recovery speed and efficiency of distribution network after disasters,power-communication coordination recovery strategies based on gridding method after disasters are proposed.Firstly,according to the corresponding relationship between mobile base stations and power nodes,multi-level grids of distribution network are divided,and power-communication coordinated recovery models of distribution network are respectively established aiming at short rush repair time and small power outage loss.Secondly,the restoration process of distribution network system after disaster is decomposed,and a coordinated recovery method with partial communication restoration in priority is proposed.On this basis,a coordinated recovery strategy of power-communication is proposed in combination with gridding method.Finally,the IEEE33-node distribution network system is taken as an example to verify the rationality and effectiveness of the proposed method.

关 键 词:极端灾害 配电网 电力-通信协调恢复 网格化方法 

分 类 号:TM721[电气工程—电力系统及自动化]

 